Murchison Mining Services Safely completed the removal of a 144 meter decommissioned caged escapeway.The escapeway was in very poor condition and removal was aided by the use of steel wire rope and clamps to add much needed strength to the escapway for the removal process.
A new escapeway was installed once the removal process was completed.
Murchison Mining Services Safely completed the removal of two
5m x 4.5 m pneumatic vent doors the two doors were reomoved and installed at a new location and re-commissioned with new PA doors installed.
Murchison Mining Services Can supply and install Stretcher access and single access airlock doors for installation in vent bulkhead walls.
Murchison Mining Services have recently completed a new rising main de-watering line. Line was completed out of DN200 PN20 SDR9 poly pipe.
Rising main length was 550m in total and 140m vertical lift pipe was fully welded and braced.
Murchison Mining Services have recently completed the change out of 420 Meters of 150nb risingmain pipework in the scuddles shaft, Work was completed over four campaigns to fit in with planned maintenance periods.
Murchison Mining have designed there escapeway modules to fit in a 1050mm boxhole - raisbore hole