Murchison Mining delivers full-service underground infrastructure and ventilation at BHP’s Carrapateena site. Our team executes critical installations and civil works with precision, safety, and efficiency.
Civil worksUnderground infrastructureVentilation
Client
BHP
Location
Carrapateena, SA
Mine type
TBC
Completion Date
Ongoing
Scope of work
Ventilation on Demand (VoD)
Constructed vent walls and installed secondary fans.
Installed rigid ducting up to Ø1600mm x 6m in backs.
Fitted 3m x Ø1200mm damper valves (0.5t) into backs.
Built ventilation control walls with custom louvres, PA doors, and integrated fan cowlings.
Installed Ø1600mm HDPE Y-pieces (130kg) in backs.
Hung and connected flexible ducting to rigid systems.
Mobilised all infrastructure and consumables from surface to underground.
Reclaimed fans, ducting, and damper valves post-installation.
Ventilation Controls
Installed high-pressure 5m x 5m pneumatic doors.
Constructed regulator walls and ventilation walls with integrated components.
Relocated and maintained secondary fans in backs.
Civil Works
Formed and poured concrete pads underground and on surface per detailed specifications:
Location, fall direction, thickness, and foundation type.
Included drains, sumps, and structural elements.
Delivered concrete pads for raisebore sites, substations, pump stations, and more.
Constructed vertical shuttering for elevated truck load bays and plinths.
Mine Dewatering Pump Stations
Installed civil pads, plinths, and sumps.
Mobilised and installed mono pump sets and SMP infrastructure.
Installed anchor points and monorails in backs.
Delivered HDPE/steel reticulation both horizontally and vertically.
Connected pipework using fittings and poly-welding.
RAW Water, Dewatering & Compressed Air Reticulation
Installed HDPE reticulation across backs and service holes.
Suspended pipework using anchors and saddles.
Connected systems with fittings and poly-welding.
Installed break tanks and pressure-reducing valves.
Fingerpass Grizzly Installations
Prepared blind areas for drill & blast.
Constructed Grizzly frame around 3m x 3m Fingerpass (Main Beams 4.5t).
Placed Grizzly biscuit panels (7.2t each).
Poured 100–125m³ concrete around frame and apron.
Miscellaneous Services
Transported large items underground (crib rooms, sat stats, refuge chambers).
Delivered ad-hoc maintenance including steel door and gate repairs.